草草国产成人免费视频_日韩欧洲旡码专区在线_日夜男女高清在线免费观看_亚洲另类春色小说_国产日韩欧美在线看_国产日韩一区在线精品_狠狠色综合网丁香五月_综合精品二区国产中文字幕_小说专区亚洲春色校园_少妇人妻激情按摩系列

Industry TrendsABOUT US
Anti-falling construction of exterior wall insulation decoration integrated board
2022-07-15

As a new type of exterior wall insulation material, the exterior wall insulation decoration integrated board uses a ceramic thin plate pressed at a high temperature of 1200 degrees. The two materials are chemically synthesized once to ensure that they will not fall off permanently. The unevenness and possibility of falling off will occur in the secondary bonding. The insulation decoration integrated board is a chemically synthesized finishing layer and insulation layer, not glued. The integrated insulation finished board is directly used on the building, without the need for layered construction such as insulation layer, moisture-proof layer, protective layer, anti-corrosion layer and decorative layer, and is constructed once.

Anti-falling construction of exterior wall insulation decoration integrated board

Exterior wall insulation decoration integrated board is strong against impact and stretching of various strengths. The change of materials is attributed to the carved board, which can make the exterior wall more functional. The chemically stable rock wool insulation board will not change at low or high temperatures in the external environment. The insulation layer of the exterior wall insulation decoration integrated board is composed of high-density inorganic fireproof board, and its interior is an independent closed bubble structure with good sound insulation effect. It is suitable for apartments, hospitals, schools and other buildings near noise areas, effectively reducing the entry of outdoor noise.

However, with the gradual attention and relevant audits on residential building materials and decorative materials. There are more and more regular manufacturers and exterior wall insulation decorative integrated panels with stable quality. Horizontal construction should follow the principle of first positive angle and then negative angle. First ensure the symmetry and uniformity of special structures (such as doors and windows), and then carry out large-scale construction. Determine the adjustment method based on the measurement results. If the deviation is large, the design size needs to be adjusted, and it can be implemented after confirmation.