草草国产成人免费视频_日韩欧洲旡码专区在线_日夜男女高清在线免费观看_亚洲另类春色小说_国产日韩欧美在线看_国产日韩一区在线精品_狠狠色综合网丁香五月_综合精品二区国产中文字幕_小说专区亚洲春色校园_少妇人妻激情按摩系列

Industry TrendsABOUT US
Construction steps for integrated thermal insulation and decoration
2023-02-24

The construction steps of thermal insulation and decoration integration. The construction steps should first be based on the construction drawings and on-site measurement and layout data, use software to draw the simulated building facade, draw the large sample drawing, and after confirmation by the design, supervision, and construction units, calculate the number of composite integrated panels, special mortars, and hardware accessories. When pasting the external wall thermal insulation and decoration integrated panels, it is mainly started from the bottom corners of the external wall, and the pasting is done in sequence. The adjacent panels should be ensured to be close to each other and aligned. The upper and lower panels must be arranged in staggered seams, and the panels at the corners should be staggered.


After the surface polymer mortar of the bottom layer of thermal insulation and decoration integration is applied, the mesh cloth is pressed in. When the mortar is dry and not sticky, the surface layer of special polymer mortar is applied. The plastering thickness is based on covering the mesh cloth, which is about 1mm, so that the total thickness of the surface mortar protective layer is controlled at about 3mm. Prepare according to the mixing ratio provided in the instruction manual of the special adhesive, with a dedicated person in charge, strict measurement, mechanical stirring, and ensure uniform mixing. The mixed adhesive can be used after being stirred for 5 minutes. The adhesive must be used as soon as it is mixed, and the mixed adhesive must be well bonded.


The exterior wall plastering, exterior wall surface flatness and verticality of the integrated thermal insulation and decoration have been accepted and qualified. The base wall surface should be solid and flat, and the flatness and verticality of the cement mortar leveling layer should meet the requirements of relevant standards. The base wall surface and its cement mortar leveling layer have been accepted and qualified in accordance with the specifications. If the height of the building is higher than 50 meters, the density of the fluorocarbon paint panel for integrated thermal insulation and decoration should be less than 10 kilograms per square meter. The bonding area between the decorative board and the base board shall not be less than 40%. If the bonding area of the building is greater than 50 meters, the bonding area between the boards shall not be less than 60%. This is in sharp contrast to the high-end coatings such as metal paint and fluorocarbon paint, which use more than ten processes to process the base in order to achieve the effect of imitating aluminum plates.